top of page

JKT02&05 DATA CENTRE [40MW]

Greenland International Industrial Center [GIIC], Bekasi, Indonesia
Karawang International Industrial City [KIIC], Karawang, Indonesia

A preliminary study for a 19.2MW data centre in GIIC and 28.8MW data centre in KIIC. Building structure is designed to resist earthquake excitations to SNI1726:2009 from the nearby Cimandiri fault (50km away) and Sumantran fault (220km away) subjecting the site to a high level of seismicity (0.38g or 38%g at bedrock for a 2% probability of exceedance in 50 years and corresponding to a return period of 2,475 years).

Client: Confidential

Consultancy Scope: Preliminary Structural, Civil and Geotechnical Engineering

Project Cost: Confidential

Project Status: Preliminary

Tel: +603 2732 5521

Fax: +603 2732 5524

Maverick United Consulting Engineers

Malaysia | Australia

H-1-2 Pusat Perdagangan, Jalan Persiaran Jalil 1, Bukit Jalil City, 57000 Kuala Lumpur, Malaysia

  • Google Places
  • LinkedIn

©2025 by Maverick United Consulting Engineers.

bottom of page