top of page
BBCC PARCEL 5 LINK BRIDGE STRUCTURE, BUKIT BINTANG
Kuala Lumpur, Malaysia
A 50m odd span 400 tonne steel double-decked vierendeel pedestrian bridge structure that links the luxury residential towers with the integrated shopping mall. The bridge involved intricate connection engineering and staged construction sequence design.
​
Client: BBCC Development Sdn Bhd
​
Consultancy Scope: Full Structural Engineering
​
Project Cost: RM10mil.
​
Project Status: Completed in 2021
bottom of page