top of page

AMPANG LINE EXTENSION TRAIN STATIONS

Kuala Lumpur, Malaysia

13 no. Light Rapid Transit (LRT) elevated stations structures within the RM1.5bil. Ampang Line LRT extension project. The station structure consists of a concourse level of steel construction (spanning over road width requirements) supporting a platform level of RC construction and an encompassing steel roof over. The design involves careful construction feasibility and sequencing considerations due to the location of the stations in highly urbanized and trafficked sites. A significant feature of the station structure is the long span tubular arched trussed roof structure. The structural design caters for vehicular impact loading in common with Bridge Design Codes and the seismic design of significant public facilities in this low-level seismicity region. Pedestrian link way bridges of a variety of types and forms frame into the station structure to provide access for commuters.

​

Note project is a previous principal work experience at HSS Engineering Sdn Bhd.

​

Client: Government of Malaysia

​

Consultancy Scope: Full Structural Engineering

​

Project Cost: RM1.5bil.

​

Project Status: Completed in 2014

Tel: +603 2732 5521

Fax: +603 2732 5524

Maverick United Consulting Engineers

Malaysia | Australia

H-1-2 Pusat Perdagangan, Jalan Persiaran Jalil 1, Bukit Jalil City, 57000 Kuala Lumpur, Malaysia

  • Google Places
  • LinkedIn

©2025 by Maverick United Consulting Engineers.

bottom of page